Daily Field Report

Date :01/05/2023
Project No :2022C165
Client Company :Toll Bros. Inc.
Arrival Time :01/05/2023 10:00
Onsite Hours :03:00
Name of the Project :Northfield @ Polo Fields - Phase2
Project Location :Pittman Road, Cumming, GA
Weather :Sunny
Departure Time :01/05/2023 13:00
ASEC Technician Name :Vidal Dias

Observations/Finding

Our ASEC representative visited the site to observe the soil conditions for placing pipe. The site soil conditions were observed to be above optimum moisture content levels. Soils were saturated due to heavy rain. The work area is outlined by the red rectangle on the attached drawing. Photos A, B and C highlight the areas of excessive saturation.

Contractor mentioned that the placement of backfill around manhole was temporary and that it would be removed when placement of pipe begins to connect to the second manhole.

MAP

A

B

C

Technician Signature / DateVidal Dias, January 5, 2023
Reviewer Name / DateKenneth Mosman, April 06, 2023