- Home
- Density Test Report Report ID: 55867
- This project is inactive from admin.Download Report
Density Test Report
Date :12/20/2022
Project No :2022C136
Client Company :Century
Arrival Time :12/20/2022 8:00
Onsite Hours :06:00
Name of the Project :Logan Pointe
Project Location :Loganville
Weather :rainy
Departure Time :12/20/2022 14:00
ASEC Technician Name :Aminullah Azimi
Observations/Finding
Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
---|---|---|---|---|---|---|---|---|---|---|
12/20/2022 | 1 | 32.5 | 86.2 | P-2 | 98.8 | 19.4 | 87.2 | 90 | D6938 | Fail |
Location : | Lot #3, Elv/Depth :-3 feet from finish grade | |||||||||
Comment : | moisture contents were observed to be above optimum moisture contents | Gauge Serial No. :85759 |
Technician Signature / DateAminullah Azimi, December 20, 2022
Reviewer Name / DateKenneth Mosman, January 16, 2023