Density Test Report

Date :12/20/2022
Project No :2022C136
Client Company :Century
Arrival Time :12/20/2022 8:00
Onsite Hours :06:00
Name of the Project :Logan Pointe
Project Location :Loganville
Weather :rainy
Departure Time :12/20/2022 14:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
12/20/2022 1 32.5 86.2 P-2 98.8 19.4 87.2 90 D6938 Fail
Location : Lot #3, Elv/Depth :-3 feet from finish grade
Comment : moisture contents were observed to be above optimum moisture contents Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, December 20, 2022