Density Test Report

Date :11/21/2022
Project No :2022C136
Client Company :Century
Arrival Time :11/21/2022 8:00
Onsite Hours :04:30
Name of the Project :Logan Pointe
Project Location :Loganville
Weather :cloudy
Departure Time :11/21/2022 12:30
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
11/21/2022 1 29.5 88.1 P-3 96.5 22.2 91.3 90 D6938 Pass
Location : Lot 50, Elv/Depth :-1 below finished grade
Comment : Gauge Serial No. :85759
11/21/2022 2 29.6 89.1 P-3 96.5 22.2 92.3 90 D6938 Pass
Location : Lot 47, Elv/Depth :-1 below finished grade
Comment : Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, November 21, 2022
Reviewer Name / DateKenneth Mosman, January 16, 2023