- Home
- Daily Field Report Report ID: 55588
- This project is inactive from admin.Download Report
Daily Field Report
Date :11/10/2022
Project No :2022C136
Client Company :Century
Arrival Time :11/10/2022 7:00
Onsite Hours :05:00
Name of the Project :Logan Pointe
Project Location :Loganville
Weather :cloudy
Departure Time :11/10/2022 12:00
ASEC Technician Name :Aminullah Azimi
Observations/Finding
Our ASEC representative arrived on site, as requested, to observe the compaction of soils for building pads from Lot #58 to Lot #63, The sheeps-foot roller broke down, so the contractor used a fully load dump truck for compaction. Density tests were then taken. Test results indicated that the compacted material, at the areas and elevations tested did not meet the project requirements of 95% of compaction. It was recommended to undercut the soils to a depth of 1.5′ and aerate prior to recompaction.
Technician Signature / DateAminullah Azimi, November 10, 2022
Reviewer Name / DateKenneth Mosman, November 13, 2022