Daily Field Report

Date :04/19/2022
Project No :2020C007
Client Company :Pulte Group
Arrival Time :04/19/2022 03:45
Onsite Hours :01:00
Name of the Project :Winslow at Brookstone
Project Location :6156 Collins Road, Acworth, GA 30101
Weather :
Departure Time :04/19/2022 04:45
ASEC Technician Name :Jamal Geathers

Observations/Finding

AS Engineering and Consulting, LLC. has completed an engineering evaluation of the basement wall/stem wall footing at Lot #47.  The footing evaluation was performed by visual inspection, hand probing, and Dynamic Cone Penetrometer (DCP) testing. During the evaluation, well compacted fill soils were encountered underlain by residual soils.

These soils were found to be suitable for an allowable soil bearing pressure of 2,000 psf.

Reinforcing steel for the footing was visually inspected and appeared to meet job specifications for size, spacing and quantity.

Technician Signature / DateJamal Geathers, April 19, 2022
Reviewer Name / DateKenneth Mosman, May 08, 2022