Daily Field Report

Date :04/20/2022
Project No :2021C073
Client Company :DR Horton West
Arrival Time :04/20/2022 07:30
Onsite Hours :02:00
Name of the Project :Tributary C2A
Project Location :Riverside Parkway, City of Douglasville, GA
Weather :
Departure Time :04/20/2022 09:30
ASEC Technician Name :Jamal Geathers

Observations/Finding

The site was visited by the undersigned AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawings/specifications, applicable codes, and materials submittals.

Our ASEC representative performed foundation bearing tests in the below referenced footing areas.  All referenced footings were found to meet the job specification for a soil bearing pressure of 2,500 psf.

A reinforcing steel inspection was performed on the following locations: (Lots #88 & 89).  Reinforcing steel was observed to meet job specifications for required size, spacing, and quantity. No discrepancies were noted.

If foundation soils become wet prior to concrete placement, they should be reevaluated by a geotechnical engineer or qualified soils technician. All soft, wet soils or debris should be removed from foundations prior to concrete placement.

 

DCP LOCATION:
Lot #, North/South/Center etc
88A DCP LOCATION:
Lot #, North/South/Center etc
88D
Depth
(feet)
Set
2″
N
1.75″
Description Depth
(feet)
Set
2″
N
1.75″
Description
1 5 9 1 5 15
2 5 9 2 5 9
3 5 AR 3 5 AR
4 4
5 5
6 6
7 7
8 8
9 9
10 10
DCP LOCATION:
Lot #, North/South/Center etc
89 A DCP LOCATION:
Lot #, North/South/Center etc
89 D
Depth
(feet)
Set
2″
N
1.75″
Description Depth
(feet)
Set
2″
N
1.75″
Description
1 5 15 1 5 12
2 5 AR 2 5 17
3 3 5 AR
4 4 5
Technician Signature / DateJamal Geathers, April 20, 2022
Reviewer Name / DateKenneth Mosman, May 08, 2022