Skip to content

Density Test Report

Date :04/19/2022
Project No :2021C078
Client Company :CCG Constructors LLC (Century)
Arrival Time :04/19/2022 10:00
Onsite Hours :07:30
Name of the Project :Pickens Landing Development
Project Location :Dacula, GA
Weather :66 Degree's, Sunny
Departure Time :04/19/2022 17:30
ASEC Technician Name :Rasheen Biggins

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
04/19/2022 1 21.1 91.6 P-5 102.4 17.8 89.5 95 D6938 Fail
Location : Roadside , Elv/Depth :931ft
Comment : Contractor informed of failing compaction test. Re-compaction is required. Gauge Serial No. :38069
04/19/2022 2 21.1 95.9 P-5 102.4 17.8 93.7 95 D6938 Fail
Location : Sewer Line, Between A8 and A7 Structures , Elv/Depth :935ft
Comment : Contractor informed of failing compaction test. Re-compaction is required. Gauge Serial No. :38069
04/19/2022 3 20.3 100.3 P-5 102.4 17.8 97.9 95 D6938 Pass
Location : Roadside, Elv/Depth :931ft
Comment : Gauge Serial No. :38069
04/19/2022 4 22.5 96.7 P-5 102.4 17.8 94.4 95 D6938 Fail
Location : sewer line , Elv/Depth :
Comment : Contractor informed of failing compaction test. Re-compaction is required. Gauge Serial No. :38069
04/19/2022 5 14.5 103.3 P-5 102.4 17.8 100.9 95 D6938 Pass
Location : Sewer line, Elv/Depth :
Comment : Gauge Serial No. :38069
04/19/2022 6 20.4 98.2 P-5 102.4 17.8 95.9 95 D6938 Pass
Location : sewer line, Elv/Depth :
Comment : Gauge Serial No. :38069
Technician Signature / DateRasheen Biggins, April 19, 2022
Reviewer Name / DateKenneth Mosman, May 08, 2022