Skip to content

Daily Field Report

Date :04/12/2022
Project No :2021C060
Client Company :Pulte Group
Arrival Time :04/12/2022 09:00
Onsite Hours :01:00
Name of the Project :Suncity - Peachtree
Project Location :Griffin, GA
Weather :
Departure Time :04/12/2022 10:00
ASEC Technician Name :Jamal Geathers

Observations/Finding

The site was visited by the undersigned AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawings/specifications, applicable codes, and materials submittals.

Our ASEC representative performed foundation bearing tests on the below referenced footing areas.  All referenced footings were found to meet job specification for a soil bearing pressure of 2,000 psf.

A reinforcing steel inspection was performed on the following location: (Lot #92).  Reinforcing steel was observed to meet job specifications for required size, spacing, and quantity. No discrepancies were noted.

If foundation soils become wet prior to concrete placement, they should be reevaluated by a geotechnical engineer or qualified soils technician. All loose and soft soils or debris should be removed from foundations prior to concrete placement.

DCP LOCATION:
Lot #, North/South/Center etc
92
Depth
(feet)
Set
2″
N
1.75″
Description
1 5 20
2 5 16
3 5 20
4 5 20
Technician Signature / DateJamal Geathers, April 12, 2022