Date :03/31/2022
Project No :2021C060
Client Company :Pulte Group
Arrival Time :03/24/2022
Onsite Hours :
Name of the Project :Suncity - Peachtree
Project Location :Griffin, GA
Weather :
Departure Time :03/24/2022
ASEC Technician Name :Russell Hendrix
Observations/Finding
The site was visited by the undersigned AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to assure compliance with project drawings/specifications, applicable codes, and materials submittals. The following observations were made on site today:
A request was made for a footing inspection at Lot #83 Pod #13 in Suncity. All rebar was placed as per job specifications for size, quantity, and spacing. The footing was probed with a 3/8-inch probe rod and found to be firm. please see attached table.
DCP TEST DATA SHEET | ||||||||||||
Project Name: | Suncity | Date: | 03/24/22 | |||||||||
Project Number: | 2021c060 | Technician: | Russ Hendrix | |||||||||
Project Location: | Griffin | |||||||||||
DCP LOCATION: Lot #, North/South/Center etc |
Lot 83 pod 13 | DCP LOCATION: Lot #, North/South/Center etc |
Lot 83 pod 13 | |||||||||
Depth (feet) |
Set 2″ |
N 1.75″ |
Description | Depth (feet) |
Set 2″ |
N 1.75″ |
Description | |||||
1 | AR | Red sandy silt | 1 | AR | Red sandy silt | |||||||
2 | 2 | |||||||||||
3 | 3 | |||||||||||
4 | 4 | |||||||||||
5 | 5 | |||||||||||
6 | 6 | |||||||||||
7 | 7 | |||||||||||
8 | 8 | |||||||||||
9 | 9 | |||||||||||
10 | 10 | |||||||||||
DCP LOCATION: Lot #, North/South/Center etc |
off set, back center of footing | DCP LOCATION: Lot #, North/South/Center etc |
||||||||||
Depth (feet) |
Set 2″ |
N 1.75″ |
Description | Depth (feet) |
Set 2″ |
N 1.75″ |
Description | |||||
1 | Ar | Red sandy silt | 1 | |||||||||
2 | 2 | |||||||||||
3 | 3 | |||||||||||
4 | 4 | |||||||||||
5 | 5 | |||||||||||
6 | 6 | |||||||||||
7 | 7 | |||||||||||
8 | 8 | |||||||||||
9 | 9 | |||||||||||
10 | 10 | |||||||||||
NOTES: | ||||||||||||
Technician Signature / DateRussell Hendrix, March 31, 2022