- Daily Field Report Report ID: 53427
- This project is inactive from admin.Download Report
Daily Field Report
Observations/Finding
The site was visited by the undersigned AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to assure compliance with project drawings/specifications, applicable codes, and materials submittals. The following observations were made on site today:
A meeting was held with Chris Bray, superintendent for Charles Pruitte, Inc in regard to the excavation located near the pump station at the X9 manhole. Rock was discovered in an area that measured to be approximately 10 feet x 30 feet x 4 feet in depth. An excavator with a hammer would be required to remove these materials.
Fill lifts were started on Pickens Landing drive from Sta 1+25 to 2+75 (Lots #1 & 2). Lifts were placed between 10 to 13 inches in thickness. A discussion with Brad the grading foreman was initiated about lift sizes. The soil types were a mix with a small amount of organic material. Please see attached density tests.