- Home
- Daily Field Report Report ID: 53265
- This project is inactive from admin.Download Report
Daily Field Report
Observations/Finding
The site was visited by the undersigned AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to assure compliance with project drawings/specifications, applicable codes, and materials submittals. The following observations were made on site today:
Approximately eight dump trucks were used to import soils to be used as fill for the proposed main road Friendship Falls Way & side road Friendship Creek Drive. Materials were placed in 12-inch lifts and compacted using a Bomag BW 211 vibratory roller. See attached Density report. Ground movement (pumping and rutting) was noted as vehicles passed over the compacted areas. This was discussed with Dennis the grading foreman on site.