- Home
- Daily Field Report Report ID: 52950
- This project is inactive from admin.Download Report
Daily Field Report
Observations/Finding
The site was visited by the undersigned AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawings/specifications, applicable codes, and materials submittals. The following observations were made on site today:
A meeting was held with the following individuals present (in person or via phone). Brent with Century homes, Chris Bray – foreman with Pruitt enterprises, Josh the wall crew foreman, and Ram Mogulla with ASEC. This included a general discussion of the site. Plans for the proposed wall were given to ASEC. It was determined that ASEC would be notified in regard to scheduling to allow time for footing DCP inspections, concrete testing and any other required on-site inspections.