Skip to content

Density Test Report

Date :09/30/2021
Project No :2021C074
Client Company :DR Horton West
Arrival Time :09/30/2021 16:30
Onsite Hours :02:00
Name of the Project :Oakhurst Glen - Ph 4
Project Location :Mallord Drive, South Fulton, GA
Weather :Partly cloudy
Departure Time :09/30/2021 18:30
ASEC Technician Name :Christopher Burrow II

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
09/30/2021 1 16.6 101.0 P-3 103.0 18.1 98.1 95 D6938 Pass
Location : Left center of lot 295, Elv/Depth :3’ below final grade
Comment : Gauge Serial No. :38069
09/30/2021 2 15 104.4 P-3 103.0 18.1 101.4 95 D6938 Pass
Location : Center of cul-de-sac by lot 295, Elv/Depth :3’ below final grade
Comment : Gauge Serial No. :38069
Technician Signature / DateChristopher Burrow II, September 30, 2021
Reviewer Name / DateKenneth Mosman, December 04, 2021