Skip to content

Density Test Report

Date :10/25/2021
Project No :2021C070
Client Company :CCG Constructors LLC (Century)
Arrival Time :10/25/2021 02:00
Onsite Hours :03:00
Name of the Project :Harmony Heights
Project Location :Mt. Olive Road at Brentwood Drive, Commerce, GA
Weather :cloudy
Departure Time :10/25/2021 05:00
ASEC Technician Name :Russell Hendrix

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
10/25/2021 1 20.8 96.9 P-01 102.0 16.6 95.0 95 D6938 Fail
Location : Lot 121-Lot 122, Elv/Depth :900
Comment : Gauge Serial No. :30942
10/25/2021 2 18.6 102.1 P-02 105.6 16.6 96.7 95 D6938 Pass
Location : Lots 121-Lots 122, Elv/Depth :900
Comment : Had discussion with Foreman. additional compacting was done. Gauge Serial No. :30942
10/25/2021 3 (retest of 1&2) 18.9 103.6 P-02 105.6 16.6 98.1 95 D6938 Pass
Location : Lots 121-122, Elv/Depth :900
Comment : Pass after continued compaction. Gauge Serial No. :30942
Technician Signature / DateRussell Hendrix, October 25, 2021
Reviewer Name / DateRamchandra Mogulla, November 18, 2021