Density Test Report

Date :09/04/2021
Project No :2021C070
Client Company :CCG Constructors LLC (Century)
Arrival Time :09/04/2021 07:30
Onsite Hours :02:00
Name of the Project :Harmony Heights
Project Location :Mt. Olive Road at Brentwood Drive, Commerce, GA
Weather :sunny
Departure Time :09/04/2021 09:30
ASEC Technician Name :Russell Hendrix

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
09/04/2021 1 19.6 101.7 P-01 102.0 16.6 99.7 95 D6938 Pass
Location : back of lot 109, Elv/Depth :897
Comment : Gauge Serial No. :29588
09/04/2021 2 21.1 100.8 P-01 102.0 16.6 98.8 95 D6938 Pass
Location : back of lot 110, Elv/Depth :897
Comment : Gauge Serial No. :29588
09/04/2021 3 18.4 97.0 P-01 102.0 16.6 95.1 95 D6938 Pass
Location : back of lot 111, Elv/Depth :897
Comment : Gauge Serial No. :29588
09/04/2021 4 21.1 102.8 P-02 105.6 16.6 97.3 95 D6938 Pass
Location : back of lot 118, Elv/Depth :896
Comment : Gauge Serial No. :29588
09/04/2021 5 19.2 117.1 P-01 102.0 16.6 96.3 95 D6938 Pass
Location : back of lot 119, Elv/Depth :893
Comment : Gauge Serial No. :29588
09/04/2021 6 19.1 108.4 P-02 105.6 16.6 102.7 95 D6938 Pass
Location : back of lot 120, Elv/Depth :891
Comment : Gauge Serial No. :29588
Technician Signature / DateRussell Hendrix, September 4, 2021
Reviewer Name / DateRamchandra Mogulla, November 18, 2021