Skip to content

Density Test Report

Date :09/08/2021
Project No :2021C070
Client Company :CCG Constructors LLC (Century)
Arrival Time :09/08/2021 08:00
Onsite Hours :05:15
Name of the Project :Harmony Heights
Project Location :Mt. Olive Road at Brentwood Drive, Commerce, GA
Weather :cloudy
Departure Time :09/08/2021 13:15
ASEC Technician Name :

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
09/08/2021 1 18.5 119.9 P-01 102.0 16.6 99.2 95 D6938 Pass
Location : slope behind lot 118, Elv/Depth :875
Comment : Gauge Serial No. :29588
09/08/2021 2 19.7 105.3 P-01 102.0 16.6 103.2 95 D6938 Pass
Location : area behind lot 119, Elv/Depth :875
Comment : Gauge Serial No. :29588
09/08/2021 3 19.6 118.6 P-01 102.0 16.6 97.3 95 D6938 Pass
Location : area behind lot 120, Elv/Depth :875
Comment : Gauge Serial No. :29588
09/08/2021 4 19.8 102.3 P-01 102.0 16.6 100.3 95 D6938 Pass
Location : behind lot 121, Elv/Depth :870
Comment : Gauge Serial No. :29588
Technician Signature / DateRussell Hendrix, September 8, 2021
Reviewer Name / DateRamchandra Mogulla, November 18, 2021