Daily Field Report

Date :12/07/2020
Project No :
Client Company :DR Horton
Arrival Time :12/07/2020 10:00
Onsite Hours :04:00
Name of the Project :Monet Gardens
Project Location :River Road at Green Pastures Way, Ellenwood, GA
Weather :Overcast
Departure Time :12/07/2020 14:00
ASEC Technician Name :Dave Bek

Observations/Finding

The site was visited by the undersigned AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to assure compliance with project drawings/specifications, applicable codes, and materials submittals. The following observations were made on site today:

  1. On-site today @ 10:00 for general earthwork observation. Due to heavy rains the night before the resulting ground saturation levels were very high. The contractor to expedite drying spread overly saturated topsoil to various areas of the site.
  2. No structural compaction was performed today.
  3. Excavation work continued on sewer line A at the intersection of Green Pasteurs Way and River Rd.

Sewer Line A at Intersection of Green Pasteurs Way and River Rd

Technician Signature / DateDave Bek, December 7, 2020
Reviewer Name / DateRamchandra Mogulla, December 15, 2020